unicornduke: (Default)
[personal profile] unicornduke
home inspection with incredible thoroughness options has been scheduled. we are going standard inspection and adding on radon testing, well water testing, chimney inspection for the wood stove, and termite and wood inspection because it's a log home. That will be Saturday afternoon because both F and I can make it that time. My work is starting to pick up although two of the three people I support haven't emailed me back yet about this week's schedule. Shrug.

Septic has also been scheduled, unfortunately not at the same time, but Monday morning. A little more annoying because they'll call me when they're coming in a two hour block but easier because work is not busy at that time and also really only one of us needs to be there. I'll go hang in my truck or something. Or maybe with the seller since she seems to like us.

Mortgage stuff is going with some minor confusion but it should be all fine.

Attorney got back to us yesterday and is doing his part in this and getting the title stuff.

I am keeping extensive notes and also started putting together a project list by order of priority from new dishwasher, all the way to walking path in the woods. Feels nice to plan. I also want to build a new full workshop because I think the weird shed on the property needs to just be taken down, I think it's in worse shape than it looks. Plus it is up a hill and very awkward.

Also started making a tools list and contemplating if I want to start building furniture. Might be fun
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

unicornduke: (Default)
unicornduke

December 2025

S M T W T F S
  123 4 56
7 89 1011 1213
14 151617 181920
21 222324252627
28 2930 31   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 4th, 2026 09:29 am
Powered by Dreamwidth Studios